Channel on Jalan RE Martadinata Dredged from Mud
access_time February 14 2023 06:52 PM remove_red_eye 1204
Reported by Tiyo Surya Sakti | Translated by Nugroho Adibrata
Reported by Tiyo Surya Sakti | Translated by Nugroho Adibrata
Nine workers of the Water Resources (SDA) Task Force are seen dredging the water channel that has 1.5 meters wide and 500 meters long on Jalan RE Martadinata, Ancol, Pandemangan, North Jakarta.
We dredge it with a soil crusher
Pademangan SDA Task Force Coordinator, Akhirudin stated that the channel is dredged to maximize water flow which aims to minimize inundation when it rains.
"We dredge it with a soil crusher
, because a lot of hardened mud," he expressed, Tuesday (2/14).Next Week, Channel Dredging in Kayu Manis CompletedHe explained it is targeted to be completed in early March 2023.
"We can pick up 350 sacks of waste and mud per day," he explained.
Herman (37), a resident believes draining this channel can reduce inundation on Jalan RE Martadinata.
"My hope is we can be free of inundatiom when we pass the road," he hoped.